COMPLEX MULTI-TUBE BOILER of Changhwaenergy co.,ltd.

Product

COMPLEX MULTI-TUBE BOILER
  • COMPLEX MULTI-TUBE BOILER
  • COMPLEX MULTI-TUBE BOILER
Quick Steam : Within 5 minutes of ignition dry steam generated 98%
Heating Surface Area Greater than 20%
Boiler Combustion Chamber : Rectangle(Tunnel Structure)
Suitable for renewable fuel burner
The world's first front sides 5 pass combustion boiler
Shape : Small High-Efficiency Boiler
Renewable Fuel Burner– Coal(Pell...

Description of the Product

Quick Steam : Within 5 minutes of ignition dry steam generated 98% 
Heating Surface Area Greater than 20%
Boiler Combustion Chamber : Rectangle(Tunnel Structure)
Suitable for renewable fuel burner
The world's first front sides 5 pass combustion boiler
Shape : Small High-Efficiency Boiler 
Renewable Fuel Burner– Coal(Pellet) Feeder
Matching complete combustion condition (Coal(Pellet) constant supply)
Automatic screw ash handling equipment
Sludge debris and ash removal excellence

Price of the Product

Price not indicated

Technical Details


Quick Stem : Within 5 minutes of ignition dry steam generated 98%
Heating surface Area Greater than 20%
Boiler Combustion chamber : Rectangle(Tunnel Structure)
Suitable for renewable fuel burner
The world’s first front sides 5 pass combustion boiler
Shape : Small High-Efficiency Boiler

Ask for a quote

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
*Mandatory fields

Company catalogues -  Changhwaenergy co.,ltd.

Click on the picture to display the catalogue

Changhwa Energy Catalogue (English)

28 pages

Download catalogue

Click on the picture to display the catalogue

Product Catalogue (English)

24 pages

Download catalogue